Projects & Clients
Our Clients
Our Projects
Project Experience
Filter project examples by industry. Manage these cards in WordPress under Projects and assign Industries to control the filter set.
Military & Defense
PFOS/PFOA Mitigation Interim Storm Water Treatment
Stewart ANGB, NY
Treatment of PFAS in stormwater detention pond
- Client
- Bristol Environmental Solutions
- Dates
- 2019 to present
- System
- 500 GPM treatment system consisting of hydrocyclone separation, dual stage sand filtration, dual stage bag filtration, and 4 parallel sets of GAC and IX resin vessels in a lead/lag configuration.
Military & Defense
Temporary Mitigation of Drinking Water Supply Wells
Mountain Home AFB, ID
Treatment of PFAS in drinking water
- Client
- Tanaq Environmental
- Dates
- 2018 to 2020
- System
- 1,500 GPM treatment system consisting of bag filtrations and 3 parallel sets of IX resin vessels in a lead/lag configuration
Aviation
Peterson AFB Liquid Treatment System
Peterson AFB, CO
Treatment of PFAS in stormwater detention pond used for irrigation
- Dates
- 2017 - 2020
- System
- Floating pump with suction strainer, solids separation, bag filtration, 4 parallel trains of GAC pretreatment and IX resin vessels in a lead/lag configuration.
Military & Defense
Vapor Intrusion Mitigation System Installation and Testing
Washington Navy Shipyard, Washington, D.C.
Procure, install, and commission a subslab depressurization system to mitigate TCE vapor intrusion concerns for an existing facility.
- Client
- CH2M HILL
- Dates
- 2021 - 2022
- System
- Four horizontal slotted pipe suction nodes with a central manifold and blower, with three nodes designed for 30 cfm and the fourth node designed for 100 cfm. VFD-controlled regenerative blower moisture separator for condensate management and vapor-phase GAC treatment of vapors prior to discharge.