Military & Defense
PFOS/PFOA Mitigation Interim Storm Water Treatment
Treatment of PFAS in stormwater detention pond
Project Details
- Location: Stewart ANGB, NY
- Client: Bristol Environmental Solutions
- Project Dates: 2019 to present
- System: 500 GPM treatment system consisting of hydrocyclone separation, dual stage sand filtration, dual stage bag filtration, and 4 parallel sets of GAC and IX resin vessels in a lead/lag configuration.
- Services: System design, commissioning, and rental; troubleshooting; and field services
- Key Challenges: Highly variable PFAS concentrations depending on precipitation events, sediment and biological fouling, discharge zone leads to recreational pond.
- Outcome / Result: Continuing operations in substantive compliance with discharge permit.