Military & Defense

PFOS/PFOA Mitigation Interim Storm Water Treatment

Treatment of PFAS in stormwater detention pond

PFOS/PFOA Mitigation Interim Storm Water Treatment

Project Details

  • Location: Stewart ANGB, NY
  • Client: Bristol Environmental Solutions
  • Project Dates: 2019 to present
  • System: 500 GPM treatment system consisting of hydrocyclone separation, dual stage sand filtration, dual stage bag filtration, and 4 parallel sets of GAC and IX resin vessels in a lead/lag configuration.
  • Services: System design, commissioning, and rental; troubleshooting; and field services
  • Key Challenges: Highly variable PFAS concentrations depending on precipitation events, sediment and biological fouling, discharge zone leads to recreational pond.
  • Outcome / Result: Continuing operations in substantive compliance with discharge permit.
PFOS/PFOA Mitigation Interim Storm Water Treatment