Vapor Intrusion Mitigation System Installation and Testing

Procure, install, and commission a subslab depressurization system to mitigate TCE vapor intrusion concerns for an existing facility.

Vapor Intrusion Mitigation System Installation and Testing

Project Details

  • Location: Washington Navy Shipyard, Washington, D.C.
  • Client: CH2M HILL
  • Project Dates: 2021 - 2022
  • System: Four horizontal slotted pipe suction nodes with a central manifold and blower, with three nodes designed for 30 cfm and the fourth node designed for 100 cfm. VFD-controlled regenerative blower moisture separator for condensate management and vapor-phase GAC treatment of vapors prior to discharge.
  • Services: Refine design, PLC programming, installation, commissioning, and verification testing.
  • Key Challenges: System was installed under an existing building on an urban military installation.
  • Outcome / Result: System performed to specification at commissioning with no issues.